Environmental planning, consulting & management related to the transfer, assessment, & demolition of a former horse racing track. Issues included: Manure/Debris Burial; Spill Coordination; Mercury lamps; PCB transformers, oils, & ballasts; ACMs; and spray-on Asbestos fireproofing. Coordinated & Supervised Soil & ACM sampling, Disposal of PCBs, Recycling of Hg Lamps, PCB ballasts, & Transformer carcasses, and assisted with Demolition & ACM abatement.
|
|
|
|
Design & implement a limited Phase II Environmental Site Assessment for a midwest Piping Company planning to enter into a long-term lease with a major railroad. An earlier Phase I ESA proposed widespread multi-media sampling. A more thorough program of record review and interviews was performed, eliminating most of the potential environmental conditions, while verifying others. The Client used the findings to strengthen the indemnification clause in the lease to exclude all pre-existing contamination suspected at the former Corrective Action site.
|
|
|
|
Toxic Release Inventory (TRI) revisions for a major specialty Metals Fabricator with 15 facilities in LA, OK, & TX. Work was completed on an accelerated schedule to satisfy a USEPA compliance order requiring revisions for years 1995 through 1999. Identified processing steps and TRI chemicals, and compiled data on annual TRI chemical use.
|
|
|