For Farmers, Wineries and Camps or
Resorts:
Tank Pulls and Environmental Clean-ups.
Waste Recycling. Design/build compost plants for grain, orchard or animal waste. When the waste is processed it can become an input or a marketable product.
Water Treatment. Whether it is a drinking water system or an industrial waste water, we are experience in building a system that are reliable and works well. SCS is familiar with the regulatory framework and we know what treatment is pertinent to the situation.
Pump Stations and water distribution systems. We can build you a custom system for the application at a very competitive price. We size and build the controls for hundreds of pumps from 0.5 GPM to 500 GPM.
Energy Systems. Electrical service up grades, Wind Turbines, PV System
Switchboard Pad at Hollister State Park, CA.
Switchboard Installed at Hollister State Park
Sacramento Office San Francisco Office - Ph/Fax: (916) 451-4930 - Ph/Fax: (415) 642-0668
Cell phone: (415) 297-7468 - Cell phone: (415) 810-8684
Email: scsernesto@earthlink.net