Tim's new greenhouse
| Home | The Site | Grading | Flat | post holes | Setting the posts | Gutters | Arches 1 | Arches 2 | Heater | Roof | Floor 1 | Shade Cloth | Floor 2 | Staging | Moving Plants | Finished | Our First Winter | Contact Me
Tie Rods & Arches

We connected each pair of posts with a tie rod to keep them from spreading apart when the roof was installed. Each arch comes in two pieces. We put them together and laid them out on the floor.

arches1.jpg