|
The main work
in the hall bathroom was to replace the vanity area. We chose the
same countertop as in the kitchen, and a red and silver color
combination for the cabinets.
Fortunately we
were able to find a chrome replacement for the shower fixtures, as
the bathtub and enclosure are otherwise in good shape.
The second phase of
the bathroom remodel included replacing the door to the outside, and
the window. We did want to have a door with a glass insert in order
to bring in more light - both the the bathroom as well as the
laundry area.
Back |