Spring 2008 Out exterior has now been repainted, which was a fairly straightforward job and also aspired us to clean up the overall exterior. As part of the project the trellis over the patio had to go as well - it felt too "heavy" for the house, and with it gone we have more light in the living room as well
Summer 2007

 

A project long on the list was the remodel of the master bath. While not original, the last remodel must have been 20-30 years ago and it showed. When moving in we had replaced the vanity cabinets and shower enclosure; this time around the remodel was more substantial. Our goals were to create a more contemporary look, and to create more space
Spring 2007

 

Replaced the tar & gravel roof with a new Durolast roof. We were not exactly sure how old the roof was, however, it seemed to be a good idea to look for something more efficient. As part of the roofing we added insulation to the roof for the cold season, and the roof itself is supposed to keep the house cooler during the summer months. After the first year with the new roof, we believe it does make a difference in both summer and winter, however, it is really impossible to quantify and attribute e.g. heating cost to the new roof - there are too many variables at play.
Fall 2004 Removed wood burning stove in living room fireplace and replaced with contemporary fireplace door and tools. The stove did not work very well in the first place, and also did not match the contemporary style of the house. The fireplace door was a custom order due to the dimension of our fireplace
Summer 2004 In preparation for an eventual roof replacement project, and also to improve looks and insulation, closed all gaps between ceiling boards with silicone
Summer 2004 Removed the oleander and re-planted the side yard next to the bedrooms. The oleander required lot of trimming work and blocked light to the bedrooms.
Summer 2003 Re-painted the exterior trim and front door in order to remove the last of the 'brown/beige' treatment
Spring 2003 Re-wired phone lines from the NID to all existing jacks, and installed additional wiring and jacks. All bedrooms, and family room now have CAT-5 wiring. This improved DSL reliability and quality. The wiring is currently external to the house - plan to migrate to internal when replacing the roof.
Spring 2003 Installed Satellite Dish and wiring to support both Cable TV and Satellite TV into the house
Spring 2003 Replaced exterior door in 2nd bathroom to improve lighting and security, and replaced bathroom window with state of the art double-pane (this was the last original window)
Fall 2002

Replaced heater. We noted that the radiant heat did not reach all rooms, and suspected that the heater, which was the original one installed in 1960, did not produce sufficient throughput anymore. The new heater was installed without any flaws. As part of the installation we were able to confirm that the radiant heat pipes are not leaking, and we are now able to heat all rooms. We worked with Anderson heating, and it turned out that the person who replaced our heater was actually the grandson of the person who had put in the original heater back in 1960, the old heater still had his signature and date on it.

Fall 2002 Front and backyard landscaping.