|
Submittion by NAVETSUSA Founder, Edward C. Reese (navetsusa@earthlink.net)
Find a Ship or Shipmate
|
On July 12, 1951, the Navy announced that the Newport News Shipbuilding and Dry Dock Company had been awarded a contract to build CVA-59. The keel for the new ship was laid July 14, 1952. Less than 30 months later, the first of the postwar carriers was launched. Mrs. James V. Forrestal, widow of the first Secretary of Defense, christened her USS FORRESTAL. Commissioning ceremonies were October 1, 1955, at the Norfolk Naval Shipyard on the same day. Captain Roy Johnson became the first commanding officer of FORRESTAL. Commander Ralph L. Werner, commander of the air group, recorded the first arrested landing on January 3, 1956. Since then, FORRESTAL has recorded well over 225,000 landings. Following a ten week shakedown cruise to Guantanamo Bay, Cuba, and summer operations off the Atlantic coast with the US Second Fleet, FORRESTAL was called to bolster US forces in the Mediterranean during the Suez crisis in the fall of 1956. The new carrier returned to Norfolk for Christmas, but on January 23, 1957 she sailed for her first regularly scheduled deployments as a unit of the Sixth Fleet, this time because of civil strife in Lebanon. When the crisis ended, she returned to Norfolk. From 1958 through 1966, FORRESTAL alternated between the Second Fleet in the Atlantic and the US Sixth Fleet in the Mediterranean. In June of 1967, FORRESTAL departed Norfolk for her first combat cruise in the Western Pacific as a member of the US Seventh Fleet. She took up her station on Yankee Station off the coast of North Vietnam on July 23, 1967. A tragic fire on the fifth day of combat operations brought FORRESTAL'S part in the war to a sudden end. The fire killed 134 men, and sent FORRESTAL back to Norfolk for repairs. Following seven months in Norfolk Naval Shipyard, FORRESTAL deployed for the Mediterranean in July 1968. With Air Wing Seventeen embarked, she recorded the longest CVA deployment in the Sixth Feet up to that time, more than nine months. Upon returning to Norfolk in April 1969, the ship's engineering spaces were overhauled for three months. This was followed by six weeks refresher training at Guantanamo Bay. On December 2nd, 1969, FORRESTAL deployed to
the Mediterranean for her eighth Sixth Fleet deployment which she completed
on July 8, 1970. Following a minor overhaul period at the shipyard, the
ship celebrated her 15th birthday by putting to sea for sea trials.
|
FORRESTAL returned from the Mediterranean on July 2, 1971, and entered the shipyard in Portsmouth, Virginia, on July 16 for a ten month overhaul.
After completion of her yard period, she began type training, carrier qualification of Attack Carrier Air Wing Seventeen and operational readiness evaluation off the eastern coast of the US.
In the early morning of July 10, fire broke out on the 03 level in flag country. The damage was heavy and forced FORRESTAL into the yards again at Norfolk Naval Shipyard.
FORRESTAL left the shipyard on August 18 and resumed preparation for her 10th deployment to the Mediterranean for which she departed on September 22, 1972.
On March 28th, 1973, FORRESTAL sped to Tunisia to participate in rescue operations in the flooded Medjerda River valley near Tunis. FORRESTAL helicopters from Anti-submarine Helicopter Squadron THREE transported thousands of pounds of food, water and medical supplies and rescued hundreds during the three-day operation.
After returning from the Sixth Fleet on July 6, 1973, FORRESTAL entered the shipyard for a three-month overhaul. On November 2nd, the overhaul was completed and the carrier began qualifications of the east coast.
On March 11, 1974, FORRESTAL departed Norfolk for the Mediterranean. During this deployment with the Sixth Fleet, operations in the eastern Mediterranean in the vicinity of Cyprus assured a great deal of sea time for FORRESTAL crew members.
Following her return to the US in mid-September and a brief yard period, she steamed back into the Mediterranean in March, 1975.
Another yard period followed the return of FORRESTAL to the US in September, keeping her in the Norfolk Naval Shipyard until January 1976. Routine operations were conducted but excitement quickly grew aboard her when the ship learned that the FORRESTAL was chosen to play Host Ship at the International Naval Review in New York City Harbor in July, 1976.
On July 4th, FORRESTAL gained national exposure by hosting President Ford and over 100 VIPs and news media who reviewed the arrival of the 40-odd "Tall Ships" participating in the International Naval Review from various countries around the globe.
Another "first" was experienced by FORRESTAL when on September 13th she was selected to undergo a Shock Test, a demolition of high explosives near the hull to test whether a ship of capital size could withstand the strain of full close-quarter combat and still remain fully operational.
After the successful testing of FORRESTAL and her crew, the ship returned to Norfolk, and on October 1, 1976 began yet another in a long line of "firsts" an attempt to compete an extensive overhaul, which usually takes 14 to 18 months, in only 9 months again she was successful and steamed out of the shipyard on June 14, 1977.
USS
Forrestal Print Shop 1977
Print
Shop Supervisor LIC, Edward C. Reese
![]() |
NAVetsUSA [ Previous | Next | Next 5 Sites | Random Site] Want to join our RING? Click HERE for more info!! |
![]() |
View
the NAVetsUSA Ship's Log