LayoutVision Model Rail Services
Ops Enhancements on the Deep River Southern
Former Site
New Home Page
Model RR Blog
Layout Design
Operations Planning
Opinions and Ideas
Design Gallery
Background
What's It Cost?
Results
Contact Me
Adding operation to an existing layout
 
drs_stg_2.jpg

Dave Salamon and his crew were becoming more interested in operations, but limited and out-of-reach staging was affecting session length and flexibility. He added two side-by-side staging yards, dubbing the “off-the-layout” locations Westley (the rear 3 tracks) and Eastridge. He later scenicked these visible tracks so they fit in better with his existing layout. You can see more views of his well-done N scale Deep River Southern by clicking here.