of the same. This is a better view showing the footer pads
that will support the steel columns and beams. The concrete
footer stops at the rear because this is where the stud
framing will begin for the walk-out wall. The grade at the
walk-out is not yet complete - it will be dropped nearly two
feet. The silver items in the upper left are thermal
blankets that will be used to cover the footing sites to
prevent frost from forming so that concrete can be
poured.
![]()