Page three of Fuselage Work

tailjoincrew.jpg
September 8, 2008 we finally joined the tail for good with another tail party

readytoinsulate.jpg
Ready to insulate under the floors with Abesco FP-200 fireproof foam insulation

insulating.jpg
Shooting in the insulation through lightening holes. Drilled holes for rear floors.

matcoparkbrake.jpg
I replaced Van's brake bracket with my own design to accommodate the parking brake

aharsshelf.jpg
Built a shelf for mounting an AHARS and/or a Magnometer.

readyclosebagflr.jpg
Baggage floors ready to close. Notice steps & insulation

brakelinesin.jpg
Fuel pump & filter in tunnel; brake lines done; lots of wire pulled

tailonfromside.jpg
Tail is attached! Moving on...

abescofp200.jpg
Two cans of Abesco FP-200. Works like Great Stuff but expands less. Not quite as messy.

insulationresults.jpg
After a day or two the foam is set

insulationresulttwo.jpg
The dried foam is easy to "snap" off. Any droppings are simply sanded off.

chromesteps.jpg
Had the steps chromed. Look great. Polished & primed the shafts, coating outside with T-9

closingfloors.jpg
Riveting the baggage and rear seat floors. Hope I put enough conduit in for all the wiring.

kitarrives.jpg
Finish Kit arrives 14 Jan 2009.

fusemove1.jpg
Moved the fuselage on 21 July, 2009 to the hangar. Wings already there from last week.

fusemove2.jpg
Used Tommy's trailer and van.

fuseathangar.jpg
Had a big crowd to help move. Some had already left before I could get this photo.

fusemove3.jpg
On it's way!

otherrv10.jpg
After the move, a casual shot. Notice the other RV-10 under construction in the background.