|

|
| Rear seat floors are riveted in for good. |

|
| Another shot of the brakes with the fuel selector visible in the tunnel |

|
| A look at the fuselage elevator push tubes and the left stick |

|
| The flap motor and flap torque tubes are installed. |

|
| Van's put out a Service Bulletin requiring the addition of doublers in the tail. Gerry is ready. |

|
| Drilling out rivets inside tail. I later determined that it could have been done outside. |

|
| Bob, Jerry, and Ulf pose beside the attached tail. |
|
 |

|
| The brake lines, pedals, and rudder pedals are in - sort of... |

|
| Drilling the sticks in a jig |

|
| The brake lines inside the fuselage are done. Testing with a balloon to see if they hold pressure. |

|
| A shot of what's installed so far. Notice the control sticks are in. |

|
| Joining the tail to the fuselage, got three volunteers to help. |
|