John's RV-10 Building Site
Wings #2
RV-10 Home
The Vertical Stabilizer and Rudder
The Horizontal Stabilizer
Elevators
Tail Cone
Empennage Assembly
Wings #1
Wings #2
Wings #3
Polishing
Fuselage #1
Fuselage #2
Fuselage #3 - Latest
Canopy - NEW!
Baggage Area
Electrical - Ongoing
Autopilot Servos
Builder's Log
Favorite Links
Contact Me

Working on Wings while QB Fuselage arrives

torquepushaileron.jpg
Aileron Torque tube is in

drillsnapbush.jpg
Drilling for snap bushings. The larger electrical conduit was a real pain

aileronassembly.jpg
Aileron Pushrod is attached to bell crank, checking for fit

tubinginplace.jpg
All of the Pitot and AOA tubing is pulled and in place, including the right wing - not shown

flapsailonjohn.jpg
Flaps & Ailerons are polished and on - also aligned

ailerontrimparts.jpg
The aileron trim is assembled and the push tube is marked for mounting

jigonbellcrank.jpg
Aileron push tube attached to bell crank

pitotaoatubes.jpg
pitot and AOA tubing is pulled

clocking.jpg
Checking the aileron torque tubes for proper clocking

checkforfit.jpg
Checking everything for fit, Pitot, aileron bell crank, and a place for the pitot heater control

aileronon.jpg
The Left Aileron is on to check for fit

flapsailon.jpg
Another shot of the polished ailerons and flaps mounted

installailerontrim.jpg
Aileron trim motor hooked up and installed, starting wiring with D-sub pins & sockets

e-mail John