John's RV-10 Building Site
Wings #1
RV-10 Home
The Vertical Stabilizer and Rudder
The Horizontal Stabilizer
Elevators
Tail Cone
Empennage Assembly
Wings #1
Wings #2
Wings #3
Polishing
Fuselage #1
Fuselage #2
Fuselage #3 - Latest
Canopy - NEW!
Baggage Area
Electrical - Ongoing
Autopilot Servos
Builder's Log
Favorite Links
Contact Me

QB Wings arrived on 12 November, 2006. 

gerryunloadingqbwings.jpg
Wings arrive and Gerry helps unload them

wingcritique.jpg
A couple of neighbors/friends inspect the wings in the new stand.

wingsandbox.jpg
QB wings in their stand in background; the big box on my lift cart in front.

dynonpitot.jpg
After pressure testing the wing tanks with the floats, I started on the pitot tube

pitotfabricate.jpg
I bought a Gretz mount to go along with the Dynon Pitot/AoA heated tube. Started with a brace.

pitottubebends.jpg
Bought a tube bender to bend the aluminum lines to avoid the aileron push tube

inairaoakit.jpg
At Oshkosh I bought an AOA system from InAir. All layed out. I'm putting it in the right wing

qbwingscrate.jpg
The crate that came with the QB wings is open. The Flaps are visible and the Ailerons are underneath

floatadjust.jpg
I kept getting disoriented figuring out how to bend the wires on the fuel floats, so I mounted them

pitotfit.jpg
Initial fitting of the mount and tube. Had to tap my own screw holes in pitot's brass - tough!

newsnapbush.jpg
Bought a tubing kit from SafeAir and added another tube run with their snap bushings

trioautopilotservos.jpg
Also bought my Auto Pilot Servos at Oshkosh from Trio

wingcradle.jpg
Wing Cradle

e-mail John