 |
 |
|

|
| The parts for the elevator begin to accumulate. |

|
| Starting to cleco the elevator parts together with the skins. |

|
| Elevators are ready to drill. Will start on bottom first to recover more clecoes. |

|
| You can see where I've prepped the trailing edges of the elevators for foam ribs. |

|
| Backriveting the elevator skins |

|
| Preparing to cut foam ribs for the trailing edge of elevators. |

|
| Elevators with lead counterweights are done. Now to the trim tabs. |

|
| The ChemSeal (ProSeal to you old builders) is drying on the foam ribs. First pieces of the tail cone |

|
| Elevators and trim tabs done! Will save safety wire on hinge wire for later. |
|
|
 |
 |
 |
|

|
| I was surprised at how well I bent the end tabs on the skins. |

|
| Elevators are clecoed on both sides. Notice I ran out of clecoes. |

|
| Taking advantage of my new lift cart while drilling the elevators. |

|
| With the arrival of my new WD-415s, I can finish the elevators. |

|
| A shot of the back riveting tape on the elevator skin. |

|
| Finishing the blind rivets on the front spar and ribs of each elevator. |

|
| Leading edges of the elevators are rolled and clecoed. |

|
| All the parts for the trim tabs are ready. Notice the homemade "break" I'm making out of 2x8 lumber. |

|
| Trim Tabs attached to Elevators with clecoes. Drilling next. |
|
|