|
 |
 |
|
|
| |
PACKAGES
|
Packages Include All of the Following Materials
- Nine courses of DRIED AND GRADED white pine logs for the exterior first floor walls (buyers choice of
12”D or 12” stack chink).
- All the pressure treated sill plate needed for subfloor.
- All the rim joist needed for subfloor.
- All the floor joists needed for subfloor.
- All the 3/4” plywood needed for subfloor.
- All the log plate needed to connect logs to subfloor.
- All the OLYLOG screws needed to fasten each log course.
- All the 3/8” x ½” EMSEAL asphalt impregnated foam gasket needed for each log course.
- All the hardwood dowels needed for butt ends and butt joints.
- All the log caulking needed for butt ends, butt joints, and along the log courses, double rows.
- All the stress engineered roof trusses and/or rafters (depending on model).
- All the stress engineered roof ridge beam(s).
- All the 7/16” OSB exterior roof decking needed.
- All the beveled exterior wood siding needed for gable ends.
- All the porch posts needed for porch.
- All the porch rack (header beam) needed for porch.
- All the porch rafters needed for porch.
- All the porch roof decking needed for porch.
- All the insulated double hung dual-pane windows.
- 2-(3’0 x 6’8”) 6-panel metal clad insulated entry door units.
- All the 15# roofing felt needed to dry-in the log home.
- Three (3) full sets of blueprints.
- Comprehensive construction manual.
|
|

|
|
 |
 |
|
 |
|
Significant Items Not Included
|
|
|
Our Optional Materials Package encompasses most of what's required to get your home to a "dry-in" stage.
Finishing your home requires a few other components, which are not included in our package, because they are much more easily
acquired and co-ordinated by you or your local general contractor. Here are the most notable: |
- Construction of Foundation
- Shingles or Metal Roof
- Installation of Optional Building Materials
- Heating and Cooling System
- Interior Floor Finish (Carpet, Tile, Hardwood etc.)
- Interior Stud Wall Finish (Drywall, T&G, etc.)
- Plumbing, Piping and Fixtures
- Bathroom and Kitchen Cabinets
- Electrical Wiring and Fixtures
-
|
|
WITH INCREASING PRICES IN BUILDING, DON'T WAIT!
LOCK IN THE PRICE OF YOUR DREAM LOG HOME, AND
TAKE DELIVERY WITHIN 12 MONTHS!!!
|