Some of the new parts.
|
Some of the new parts.
|
Polishing the chambers (3 and 4).
|
Close up of polished chamber, also notice a bit of work in the ports.
|
Intake side, port matching on 3 and 4 complete, 1 and 2 to go (marked with black marker).
|
Looking through the TWM intake at the port matching that's needed.
|
Another shot through the intake. Intake port sizes are roughly 50mm.
|
Port matching complete.
|
Polished exhaust port, enlarged a little, smoothed a lot (notice all machine marks are gone).
|
Exhaust port as it comes from the factory.
|
Welded air injection ports.
|
LC Engineering stroker block.
|
Machining along the base for the crank scraper.
|
Close up of machining for a stroker crank (inside the block, and notice the lip that is present to "hide" the crank scraper.
|
Test fitting the Autozone crankshaft.
|
ARP main studs installed.
|
Wiseco piston and Eagle rod ready for installation.
|
Installing the pistons. The tapered ring compressor makes like sooo much easier than the cheap Sears clamp type compressor that I used last time.
|
Test fitting the LC Engineering crank scraper.
|
Close up of main and rod caps, as well as the crank scraper clearances.
|
Filter screen for the Mikuni carbs. these are cool, time to order a full set.
|
Another view of the filter screen.
|
Font cover, pulleys and alternator on. ARP head studs ready to use!
|
Front of engine, look at that underdrive crankpulley (and underdrive water pump pulley). I think I need a prettier alternator.
|
Head, cam, rockers all installed.
|
Distributer is in, this is starting to look like an engine.
|
8mm plug wires installed, also 1/2 of a V-8 plug wire loom.
|
9lb Fidanza aluminum flywheel held in place by ARP bolts (notice the plate on the back of the engine is missing). Stock flywheel is 22 lbs.
|
11 lb ACT pressure plate installed (kind of defeats the purpose of that flywheel).
|
Clutch and flywheel removed so and plate installed on the back of the engine.
|