A work in progress, Here are a few pictures I have taken along the way

This is the lower level laid out full size on the floor.

The lower level and southbound loop take shape.

First four turn helix, one of two on the layout

Lower level has two staging yards, full size template is drawn on upper level.

Main yard at Udell taking shape, with the main line to helix 2 at the rear.

Wood skirting applied over helix 2, and a snow storm catches construction crew grading the roadbed.
That's all I have for now, more pictures to come as soon as I take some more. The layout is much farther along than the picture story tells.
08/21/98