| Preface | 9 |
| Introduction | l3 |
| part one - structural modifications | l7 |
| Getting Started | l9 |
| Raising the Roof | 23 |
| Stretching Exercises | 29 |
| Other Structural Modifications | 33 |
| Extendable Floor Space | 37 |
| Side Hinged Baggage Doors | 43 |
| The Steel Case | 51 |
| Swing-Out Radiator (Eagle) | 59 |
| Hinged Utility Support Structure | 65 |
| Part Two - Plumbing | 69 |
| Introduction to Plumbing | 71 |
| Materials | 73 |
| Fresh Water Tankage | 77 |
| Fittings and Equipment | 83 |
| Fixtures | 89 |
| Waste Water Schematic | 95 |
| Black Water Scheme | 97 |
| Grey Water Scheme | 99 |
| Piping and Fittings | 103 |
| Liquid Petroleum Gas | 107 |
| Part Three - Electrical Systems | 113 |
| Power Requirements | 115 |
| Battery Requirements | 119 |
| Generators | 123 |
|
| Converters, Inverters and Chargers | 129 |
| Fittings and Material | 133 |
| Electrical Circuits | 139 |
| Electronic Systems and Circuits | 149 |
| Gauges and Instrumentation | 153 |
| Part Four - Heating and Air Conditioning | 157 |
| Basic Considerations | 159 |
| Heating and Air Conditioning Basics | 163 |
| Heating | 179 |
| Ventilation | 195 |
| Air Conditioning | 199 |
| Summary: Heating and Air Conditioning | 213 |
| Part Five - Interior Design | 217 |
| Floor Plans | 219 |
| Walls and Bulkheads | 225 |
| Headliners | 229 |
| Window Dressing | 233 |
| Cabinets | 237 |
| Floor Treatment | 241 |
| Part Six - Exterior Design | 243 |
| Body Work | 245 |
| Prime Coats | 249 |
| Graphics and Paint Systems | 253 |
| Engines and Transmissions | 259 |
| Tires and Suspensions | 263 |
| Conclusions | 267 |
| Appendix | 269 |
| Index | 279 |
| Re-order Form | 286,288 |
|