| 12-22, scafolding down, gold colored awning installed, but rolled up in this photo. New windows in! |

|
| November |

|
| The glass is in, too bad the glare won't let you see the 511. |

|
| 1-24 The inside entry way and all the outside door trim is painted. |

|
| 2-4 Finally a good picture of the 511 glass above the outside door, taken at night. |
|
 |

|
| Scaffolding, (in November) now removed |

|
| Backdoor and deck off the mezzanine in the making. 3rd floor doesn't extend this far back. |

|
| 12-30 Glass window for over the door, in the making. |

|
| 1-20 Garry does touch up duty during our 45 degree heatwave. |

|
| 2-2 Outside copper lights. They will soon be attractively discolored by the weather. |

|
| 2-2 The awning is rolled up as in all of the photos so far. Soon, the sign will be up. |

|
| 2-4 Closer up. Terri did a fantastic job, didn't she? |
|