7/6/04
Basement floor insulation in preparation for radiant floor heat and concrete slab
|
7/8/04
Lots of interior framing is done
|
7/27/04
Most of the interior framing is completed
|
8/10/04
Basement floor was poured on Monday
|
8/12/04
Nothing like child labor to get the frame oiled
|
8/20/04
Still working the boys hard, glad they're not afraid of heights
|
10/12/04
Basement garage floor poured on Tuesday and upper garage floor poured on Wednesday
|
11/4/04
Timbers masked and taped in prep for drywall and painting
|
11/12/04 First floor mechanicals are in, pretty much ready for insulation and drywall
|
12/2/04
Stone going up on the first floor fireplace
|
12/10/04
First floor fireplace completed
|
12/31/04
Most of the drywall is installed
|
2/4/05
Finally ready for painting
|
2/8/05
Primer done and ceiling paint going up
|
|
|
2/17/05
Master bath tile set
|
2/18/05
Trim well underway
|
3/4/05
Master bath tile in place
|
3/4/05
Main stairs installed
|
3/8/05
Railing added to the main stairs
|

3/11/05
Stairs and railing complete
|

3/17/05
Hardwood flooring going down
|

3/28/05
Some lights installed
|
|

3/30/05
Hardwood floors being finished
|

4/5/05
Carpet is now installed in the loft
|

4/21/05
Entry medalion is in place
|

4/22/05
Just about finished
|
|

4/22/05
Just about finished, looking towarsd the kitchen
|
|
|
|