3/12/04
Stump clearing begins
|
3/18/04
Most of the stumps are removed
|
3/26/04
Ready to start the basement excavation
|
4/1/04 Basement mostly excavated, now for the footer trenches
|
4/2/04
Ran into a 'few' rocks in the deepest part of the basement
|
4/9/04
Excavation done, ready for footers on Monday
|
4/12/04
Footers finished despite the constant drizzle
|
4/15/04
Footers finished, drain tile inside and outside perimeter, gravel in basement, pour walls next week
|
4/19/04 Wall forms going up
|
4/20/04
Walls are all poured
|
4/21/04
With the forms removed it looks like a basement
|
4/22/04
Building up the foundation for the front entry porch
|
4/24/04
A bit of an overview before the foundation is backfilled and grading starts
|
5/10/04
Construction resumes after a 2 week hiatus, foundation waterproofed
|
5/14/04
Foundation waterproofed, drain tile installed, backfilled. Ready for Framing on Monday
|
|